BOARDS, CAPACITY AND AGEING INSTALLATIONS
Buildings gain equipment faster than they gain capacity. Overloaded boards, exhausted spare ways, rewireable fuses and cabling installed for a different use all show up during testing. We upgrade distribution boards, add sub-mains where load has outgrown the supply, and replace cabling that no longer suits the installation.